Data center and energy intelligence from DC Hub. Ask about grid power and headroom, interconnection queues, electricity and gas prices, facilities, markets, fiber and site selection, and get dated, cited answers. Start with execute_plan, which picks and chains the right tools. It also publishes the Data Center Power Index (DCPI), a daily score of where data centers can get grid power across 300+ markets.
All 96 tools were listed from the live server (tools/list) on November 15, 2026 (server DC Hub Intelligence 2.12.57). Descriptions are shortened; start with execute_plan.
execute_planA data center question spans several topics: one-call planner over grid headroom and power availability, interconnection queues, PPAs and energy pricing, power generation, gas and energy infrastructure (the Data…
Parameters: intent, context, market, capacity_mw, iso, state, lat, lon, max_steps, max_fanout, cohortclaim_free_keyWants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start.
Parameters: client_name, emailsearchA Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format).
Parameters: queryfetchHave an id from `search` and need that data center facility record (search/fetch format).
Parameters: idsearch_facilitiesAsks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text.
Parameters: query, country, state, city, operator, min_capacity_mw, max_capacity_mw, tier, limit, offset, mpp_pay, mpp_credentialget_facilityAsks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI verdict for its…
Parameters: facility_id, slug, id, name, include_nearby, include_powerget_market_intelAsks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing.
Parameters: market, metric, period, compare_to, mpp_pay, mpp_credentialget_market_dcpi_rankAsks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g.
Parameters: market_slugpredict_market_trajectoryAsks where a data center market's power outlook is heading (next 1-8 quarters).
Parameters: market_slug, horizon_quartersget_gas_indexAsks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score.
Parameters: state, limitget_gas_economicsAsks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own source label.
Parameters: market, heat_rate_btu_per_kwhget_grid_scoreboardAsks how power grids compare: demand, fuel mix or renewable share.
compare_isosAsks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential…
Parameters: isosget_intelligence_indexAsks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend.
list_transactionsAsks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives the live number), each with its disclosed value where public (many private deals…
Parameters: buyer, seller, min_value_usd, max_value_usd, deal_type, date_from, date_to, region, limit, offsetget_newsAsks for data center industry news or headlines (execute_plan also pulls news inside a broader market question).
Parameters: query, category, source, date_from, date_to, limit, min_relevancesemantic_searchA data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI deep-dive…
Parameters: q, query, corpus, ksearch_intelligenceNeed meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, permitting…
Parameters: query, q, corpus, limitget_market_contextNeed a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month outlook, M&A…
Parameters: market, max_tokensget_iso_contextNeed a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid economics across…
Parameters: iso, max_tokensget_pipelineAsks what data centers are being built, announced or permitted in a market or by an operator.
Parameters: status, country, operator, min_capacity_mw, expected_completion_before, limit, offsetget_power_pipelineAsks where new power generation is coming online (the forward supply pipeline) — e.g.
Parameters: state, ba, status, min_mw, limitget_infra_projectsAsks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network.
Parameters: type, state, status, min_capacity, min_kv, in_service_after, in_service_before, new_since, include_delisted, limitget_power_availability_timelineAsks when power will be available, or about time-to-power, in a US state: year by year.
Parameters: state, years, mwget_global_powerAsks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, wind, hydro,…
Parameters: country, fuel, status, pipeline, bbox, min_mw, limitget_interconnection_queueAsks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting.
Parameters: iso, mpp_pay, mpp_credentialget_refined_queueNeed interconnection queue projects filtered server-side.
Parameters: min_mw, max_ttp_months, iso, state, baseload_only, fuel_type, status, max_fiber_km, geocoded_only, developer, limitget_retirement_headroomAsks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection capacity), from…
Parameters: target_mw, horizon_months, region_iso, fuel_filter, limitget_hosting_capacityAsks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS.
Parameters: lat, lon, latitude, lng, longitude, radius_km, utility, market, capacity_type, min_mw, limitanalyze_parcelHas a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-boundary layer (free…
Parameters: geometry, lat, lon, latitude, lng, longitude, capacity_mwrank_sitesHave enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code.
Parameters: candidates, shortlist_name, constraints, objectives, absolute, percentile, require_complete, top_kdiscover_toolsAre unsure which DC Hub data center, power or grid tool fits: lists tools by family.
Parameters: queryplan_queryWant to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers).
Parameters: intent, contextsave_to_shortlistWants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness).
Parameters: shortlist_name, site, objectives, notesget_shortlistWants to see a saved data center site shortlist.
Parameters: name, refreshset_shortlist_alertWants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5).
Parameters: shortlist_name, percentile_below, delta_below, notifysuggest_reallocationA saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert becomes an…
Parameters: shortlist_name, drifted_site_refget_grid_dataAsks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g.
Parameters: iso, metric, period, mpp_pay, mpp_credentialget_changesAsks what changed in data center markets, facilities or deals since a date.
Parameters: since, limitget_facility_risk_deltaAsks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?".
Parameters: facility_id, market, since96 tools in total. Full tool list (markdown)
save_sitelist_saved_sitesset_market_alertsubscribe_digestset_site_alertexport_datasetfind_sitesanalyze_siteget_composite_site_scoreget_disaster_riskget_climate_intelgenerate_site_analysiscompare_sitesget_infrastructureget_fiber_intelget_fiber_readinessget_subsea_cablesget_peering_intelget_metro_fiberLive JSON-RPC calls: initialize returned DC Hub Intelligence 2.12.57 (protocol 2025-03-26); tools/list returned 96 tools; a keyless get_grid_data call for ERCOT returned live data.
Official README: endpoint, optional DCHUB_API_KEY, execute_plan as the starting tool, DCPI, keyless endpoints and install options.
npm package dchub-mcp-server 2.12.57, MIT license, with a dchub-mcp-server binary.
Official DC Hub site icon (180x180), resized to 256x256 for the local catalog asset.
Documentation checked date not recorded. Connection has not been runtime tested.
DC Hub records these tool examples: execute_plan: A data center question spans several topics: one-call planner over grid headroom and power availability, interconnection queues, PPAs and energy pricing, power generation, gas and energy infrastructure (the Data… claim_free_key: Wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. search: A Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format).
DC Hub connection details: Hosting: hosted. Transport: Streamable HTTP. Authentication: No key is needed to start; keyless calls return previews. An optional free API key (DCHUB_API_KEY, or the X-API-Key header) raises limits.
DC Hub setup notes: An MCP client that supports remote servers, or Node.js to run the npm package locally. Add https://dchub.cloud/mcp as a remote MCP server in your client. No key is needed to start. Claude Code: claude mcp add --transport http dchub https://dchub.cloud/mcp
DC Hub use cases include: Check time-to-power and grid headroom for a data center market Read live electricity prices and fuel mix for PJM, ERCOT, CAISO, MISO, SPP, NYISO and ISO-NE Rank markets by DCPI and see a BUILD, CAUTION or AVOID verdict
Remote · Streamable HTTP
hosted
No key is needed to start; keyless calls return previews. An optional free API key (DCHUB_API_KEY, or the X-API-Key header) raises limits.
© 2026 MCPfolio. All rights reserved.
get_energy_pricesget_renewable_energyget_tax_incentivesget_water_riskget_grid_intelligenceget_gas_intelligenceget_agent_registryget_backup_statussummarize_for_citationwhy_dchubdchub_servicesget_dchub_recommendationrank_marketsfind_alternativesscore_facilityai_capacity_indexhyperscaler_dealssite_selection_canvasgrid_transition_radardeal_autopsyget_permitting_intelget_air_permit_contextsimulate_scenarioresearch_tasklist_standing_intentsregister_standing_intentdelete_standing_intentplan_fiber_leadincluster_sites_by_latencybind_emailrecover_my_keysource_capacityrequest_capacity_introaccept_capacity_termsunlock_more_dataread_inboxreport_finding4777 days